With the release of the Capability Maturity Model-Integrated (CMMI) the Software Engineering Instituteputs a preliminary end to a journey started in the mid-nineties: After the release of the CMM v1.1(Software-CMM) in 1993 the efforts to issue version 2.0 were abandoned in favour of a generalpurpose Capability Maturity Model that would integrate several disciplines.
  1. [2011/04/17] CMMI Dev version 1.3 by dodude (2916)
  2. [2011/04/17] CMMI Dev version 1.2 vs 1.3 by dodude (4679)
  3. [2011/04/12] CMMI-DEV v1.2 Quick Guide by mahiakhan (2157)
  4. [2011/04/17] SCAMPI Method version 1.3 by dodude (2521)
  5. [2011/04/18] CMMI on the Web *2 by SureshK (1828)