PURPOSE╈╈╈╈..    2

PROJECT INTEGRITY
1.  ADOPT CONTINUOUS PROGRAM RISK MANAGEMENT    3
2.  ESTIMATE COST AND SCHEDULE EMPIRICALLY    5
3.  USE METRICS TO MANAGE    6
4.  TRACK EARNED VALUE    7
5.  TRACK DEFECTS AGAINST QUALITY TARGETS    9
6.  TREAT PEOPLE AS THE MOST IMPORTANT RESOURCE    10

CONSTRUCTION INTEGRITY
7.  ADOPT LIFE CYCLE CONFIGURATION MANAGEMENT    12
8.  MANAGE AND TRACE REQUIREMENTS    15
9.  USE SYSTEM-BASED SOFTWARE DESIGN    17
10.  ENSURE DATA AND DATABASE INTEROPERABILITY    19
11.  DEFINE AND CONTROL INTERFACES    20
12.  DESIGN TWICE, CODE ONCE    21
13.  ASSESS REUSE RISKS AND COSTS    22

PRODUCT STABILITY AND INTEGRITY
14.  INSPECT REQUIREMENTS AND DESIGN    24
15.  MANAGE TESTING AS A CONTINUOUS PROCESS    25
16. COMPILE AND SMOKE TEST FREQUENTLY    27